Thursday, April 9, 2020

Trestle construction, part 3

Here’s the finished trestle. The deck/stringer assembly was installed at the same time as the abutments, and the bents were then glued on from below. I used brown ballast as filler around the abutments and the bases of three of the bents, but it will eventually get covered by the final scenery. The last three bents will be “dirted in” whenever I get around to scenicking the creek.


The metal object between the rails is a RibbonRail gauge:



The abutments I made previously turned out to be too narrow for the approach fills. For the shorter abutment on the right-hand end, I was able to remove the top course from the taller abutment to substitute for the smaller one, but I then had to recast the larger (left-hand) one. The original larger casting was repurposed (upside-down) as a retaining wall, which is visible below the transfer crane in the last photo of the November 29 post.